Yes - This is a great advantage in terms of construction program, liability, safety, time and cost:

  • The builder deals with one only trade who is responsible for walls, columns and floor slabs.
  • The utilisation of floor slab formworkers increases the number of workers available for installation and increases construction speed.
  • The formworkers utilise the slab deck for the installation and bracing of the wall forms, thus eliminating the need for additional bracing. This achieves safer, faster construction without the need to co-ordinate and schedule wall construction trades.
  • Plumbing, electrical services and window installation can be carried out at any stage without interrupting the formworking trade. In this way, the formworker finishes the shell of the building without leaving the construction site.